Project Overview:
A secondary school aimed to upgrade its sports hall changing rooms to create a more modern, hygienic, and durable environment for students and staff. The project involved replacing the existing vinyl flooring with tiled flooring, installing new Whiterock cladding, and redecorating the walls.
Objectives:
- Improve hygiene and ease of maintenance.
- Enhance durability and longevity of materials.
- Provide a fresh and modern aesthetic.
- Ensure safety with slip-resistant surfaces.
Scope of Work:
- Flooring Upgrade:
- Removal of existing worn-out vinyl flooring.
- Installation of slip-resistant, easy-to-clean ceramic tiles.
- Application of grout with antimicrobial properties to enhance hygiene.
- Wall Cladding Installation:
- Removal of existing wall coverings where necessary.
- Installation of high-quality Whiterock cladding to create a seamless, water-resistant surface.
- Ensuring all joints were properly sealed to prevent moisture ingress.
- Wall Decoration:
- Surface preparation, including filling cracks and sanding.
- Application of durable, moisture-resistant paint in school colors.
- Addition of necessary signage and wayfinding elements.
Challenges & Solutions:
- Tight Schedule: The project was completed during the summer holidays to minimize disruption.
- Moisture Control: Proper ventilation and sealing methods were used to prevent future damp issues.
- Safety Considerations: Slip-resistant tiles were chosen to reduce the risk of accidents.
Results & Benefits:
- Enhanced cleanliness and ease of maintenance.
- A more aesthetically pleasing and professional-looking space.
- Increased durability, reducing long-term maintenance costs.
- Improved safety for students and staff.
Conclusion:
The refurbishment of the changing rooms successfully met the school’s objectives, providing a modernized and hygienic space. The investment in high-quality materials ensures a long-lasting and practical environment for students and staff alike.
Before






After





