Project Overview:

A school required an upgrade to its outdoor tarmac playground area. The existing surface was cracked, uneven, and deteriorating, making it unsafe for students. Additionally, the line markings for sports and activities were fading and in need of renewal. The school decided to invest in a new tarmac surface and install fresh line markings to ensure a safe and functional play area.

Objective:

  • Remove old tarmac: Safely remove the existing damaged tarmac surface.
  • Install new tarmac: Lay a new, smooth, and durable tarmac surface suitable for various sports and activities.
  • Install new line markings: Renew and install new line markings for games like football, basketball, and other recreational activities.

Scope of Work:

  1. Site Preparation:

    • Inspection and Assessment: Conduct a full site survey to assess the condition of the existing tarmac, measuring the area and identifying problem spots (e.g., cracks, pooling water, etc.).
    • Safety Planning: Implement safety measures to prevent injury during the construction process. This included setting up barriers, warning signs, and restricted access to the worksite.
  2. Removal of Old Tarmac:

    • Excavation and Demolition: Using a combination of mechanical equipment (e.g., tarmac cutters, excavators, and road planers), the old tarmac was removed to a depth suitable for resurfacing.
    • Waste Disposal: All debris was cleared and responsibly disposed of, in compliance with local regulations for construction waste.
  3. Surface Preparation:

    • Sub-base Evaluation and Preparation: The ground beneath the old tarmac was assessed for any structural issues. If necessary, the sub-base was compacted or replaced to provide a solid foundation for the new surface.
    • Levelling and Grading: Ensure proper grading for drainage to prevent water accumulation on the new tarmac surface.
  4. Installation of New Tarmac:

    • Tarmac Application: Fresh tarmac was delivered and laid by specialized machinery to create an even, smooth surface. This involved heating the tarmac, pouring it over the prepared sub-base, and compacting it using rollers.
    • Curing Time: The newly laid tarmac required sufficient time to cure and harden before being used. This process typically took several days, depending on weather conditions.
  5. Line Marking Installation:

    • Design and Planning: The required sports markings (e.g., basketball courts, football pitches, etc.) were drawn up based on the school’s specifications. The design was reviewed with school representatives to ensure it met their needs.
    • Line Marking Application: High-quality, weather-resistant paint was used to apply clear, precise line markings onto the new tarmac surface. Special equipment, like line-marking machines, ensured the lines were straight and consistent.
    • Inspection: After the paint dried, the markings were inspected for accuracy and visibility.
  6. Quality Control and Final Inspection:

    • A thorough final inspection was conducted to ensure that all work met the project specifications. This included checking the smoothness of the tarmac, the accuracy of the line markings, and overall site cleanliness.

Challenges:

  • Weather Conditions: Unpredictable weather (e.g., rain, extreme heat) posed a challenge, causing slight delays in curing and the application of line markings.
  • Site Accessibility: Limited space for machinery around the school’s grounds made it difficult to maneuver heavy equipment.
  • Disruption to School Activities: Ensuring minimal disruption to school operations and student activities was a key concern. Work was scheduled during holidays or outside school hours to mitigate any impact.

Results:

  • Improved Safety: The new, smooth tarmac surface removed hazards like cracks and bumps, ensuring the playground is safe for students.
  • Enhanced Functionality: The refreshed surface, complete with accurate line markings, allows for a wider range of activities, benefiting sports programs and recreational play.
  • Long-Term Durability: The high-quality tarmac and durable line markings ensure the facility will remain in good condition for many years.

Conclusion:

The project was a success, achieving the goal of providing a safer, functional, and aesthetically pleasing outdoor space for the school. The new tarmac surface and line markings enhance the school’s recreational facilities, while the work was completed within the designated timeframe and budget. The school can now confidently offer an improved environment for physical activities.

Before

After