Project Overview:

A primary school aimed to repurpose an underutilized library space into a modern, functional staff room equipped with a new kitchen. The goal was to create a comfortable and inviting area for teachers and administrative staff while ensuring the space was efficiently utilized.

Objectives:

  • Transform the outdated library into a relaxing and functional staff area.
  • Install a fully equipped kitchen for staff convenience.
  • Ensure the design aligns with school safety regulations.
  • Maximize available space with smart furniture and layout solutions.

Challenges:

  • Outdated infrastructure requiring electrical and plumbing upgrades.
  • Limited budget constraints requiring cost-effective solutions.
  • Maintaining school operations during the renovation process.

Project Implementation:

  • Initial Assessment & Planning:
    • Conducted a site survey to assess structural integrity, electrical, and plumbing systems.
    • Engaged key school staff and administration, to gather input on needs and preferences.
    • Developed a detailed design plan, ensuring compliance with local building regulations.
  • Demolition & Structural Modifications:
    • Removed old furniture, flooring, and outdated fixtures.
    • Reinforced walls and installed additional insulation for soundproofing.
  • Installation of Kitchen Facilities:
    • Installed new plumbing lines for sinks and water supply.
    • Added electrical outlets and upgraded wiring to accommodate kitchen appliances.
    • Installed cabinets, countertops, a refrigerator, microwave, and coffee-making facilities.
  • Interior Design & Furnishing:
    • Chose ergonomic furniture, including tables, chairs, and lounge seating.
    • Installed new flooring, modern lighting, and fresh wall paint to enhance aesthetics.
    • Integrated storage solutions to keep the area organized and clutter-free.
  • Final Touches & Handover:
    • Conducted quality checks and safety inspections.
    • Provided staff training on using new kitchen appliances safely.
    • Officially handed over the space for staff use.

Outcome & Impact:

  • The staff now enjoys a comfortable, well-equipped space to unwind and collaborate.
  • The addition of a kitchen has improved convenience, allowing staff to prepare meals and beverages.
  • The modernized space enhances staff morale and contributes to a positive school environment.

Conclusion:

The refurbishment successfully transformed an outdated library into a contemporary, multi-functional staff room. By carefully planning the renovation, addressing challenges effectively, and incorporating staff feedback, the project delivered a high-value space within budget constraints. This case study highlights the importance of strategic refurbishments in improving school facilities and overall staff well-being.

Before

After