Project Overview:
The project involved the renewal of underfloor heating (UFH) pipes and the replacement of flooring in a high-end £2 million apartment located in a prime area in London. The existing underfloor heating system had been damaged, leading to leaks that caused water damage in multiple rooms. Additionally, the affected rooms required redecoration to restore the apartment to its luxurious state.
Client Brief:
The client of a prestigious luxury apartment, was faced with significant issues related to their underfloor heating system. The UFH pipes had suffered from damage following a bad installation, leading to leaks that affected both the flooring and the structural integrity of the affected rooms. As the apartment was worth £2 million, the client emphasized the importance of the renovation matching the high standards and quality of the original fit-out. The following were key objectives:
- Renewing the underfloor heating system without disrupting the living space for long.
- Repairing leaks and ensuring that the UFH pipes were fully functional.
- Replacing damaged flooring with materials that reflected the luxury status of the apartment.
- Restoring the aesthetic appeal of the affected rooms through high-quality redecoration.
Challenges:
- Leak Detection and Resolution: Identifying the exact location and extent of the leaks from the UFH system was challenging. The damage was widespread, and some leaks were hidden under existing floor materials.
- Minimal Disruption: The client requested minimal disruption, as the apartment was still occupied. This required meticulous planning to ensure that work was completed in phases to avoid extended periods of inconvenience.
- Maintaining Aesthetic Standards: The apartment had bespoke interior finishes, and the materials chosen for the flooring and walls had to maintain the same luxurious look while addressing the underlying issues.
- Specialist Work: Underfloor heating systems require specialized knowledge to ensure the correct installation of new pipes and connections.
Approach & Solution:
-
Initial Assessment and Planning:
- Inspection & Leak Detection: The first step was to carry out a full inspection of the affected areas. Specialist thermal imaging equipment was used to locate the leaks within the pipes, as the system was integrated into the flooring. This allowed for a more targeted approach to fixing the leaks.
- Detailed Floor Plan Review: A detailed survey of the floor plans was done, and the contractor identified which areas needed to be stripped back completely and where partial repairs would suffice.
- Project Scheduling: Given the client’s request for minimal disruption, a phased approach was planned to allow certain rooms to remain functional while others were under construction.
-
UFH System Renewal:
- Pipe Replacement: The damaged UFH pipes were replaced with high-quality, flexible, cross-linked polyethylene (PEX) pipes that offer better resistance to leaks and ensure a longer lifespan. The new system was designed to be more energy-efficient and capable of providing even heat distribution throughout the apartment.
- Insulation: The new underfloor heating system was installed with advanced thermal insulation to improve efficiency and reduce heat loss.
- Testing: After installation, the entire system underwent thorough pressure testing to ensure no further leaks and that it would function properly once the flooring was replaced.
-
Flooring Restoration:
- Floor Removal: The existing flooring was carefully removed to prevent further damage to the underlying structure. Damaged sections of the subfloor were repaired to ensure a level surface for the new flooring.
- Premium Materials: High-end materials, such as engineered hardwood and Italian marble tiles, were selected to replace the damaged flooring. The flooring was chosen to complement the aesthetic of the apartment, with custom designs created to fit the specific style.
- Installation: The new flooring was installed in such a way that it accommodated the UFH system. Expert installation was key to ensuring the flooring did not interfere with the heating pipes, ensuring optimal heat transfer and long-term functionality.
-
Redecoration and Finishing Touches:
- Wall Repairs and Repainting: Once the flooring and heating systems were in place, the affected walls were repaired, primed, and repainted using high-quality finishes. Custom paint colors were applied to maintain the cohesive design of the apartment.
- Restoration of Luxury Features: Damaged elements like baseboards, crown molding, and lighting fixtures were either repaired or replaced to restore the apartment’s upscale look. Designers worked closely with the client to ensure that the décor matched the luxury finishes expected in such a high-value property.
Outcome and Results:
- System Functionality: The new underfloor heating system was fully operational, ensuring consistent and efficient heat distribution throughout the apartment. The UFH pipes were leak-free, and the system performed better than the original installation.
- Aesthetic Restoration: The apartment was restored to its original luxury, with the new flooring enhancing the overall design. The client was extremely pleased with the premium materials used, which matched the sophisticated ambiance of the apartment.
- Minimal Disruption: The phased approach allowed the client to maintain a functional living space throughout the renovation process. The work was completed on time, and the apartment was ready for full occupancy as soon as the renovations were completed.
- Enhanced Property Value: With the renewal of the underfloor heating system, high-quality flooring, and expert redecoration, the apartment’s value was maintained at its £2 million level, with the added benefit of improved energy efficiency and long-term reliability.
Conclusion:
This case study demonstrates the importance of combining expert craftsmanship with high-quality materials and strategic planning to ensure the successful renovation of a high-value luxury apartment.